Skip to main content

January 11, 2025. Time for a project

 With a temporary lull while we await the next power shutdown it is time to ponder new projects. But 1st is to finish the tube final for the Hybrid rig.

As a nation there is a lot to ponder. If the new administration moves forward with annexation of Canada, the Canal Zone and Greenland what would be their call signs. The Canal Zone used to be KZ5, but no precedent for Canada or Greenland. Heavy stuff.

Maybe the plan is to deport the 11 million illegals to Greenland. But not even God knows. Or perhaps an agreement with Russia to send them to Siberia. It would be such a deal for the king deal maker. Ridiculous you say -- nothing is off the table with those who will soon lead you.

Pray for those affected by the LA fires --recovery will be long and painful.

73's
Pete N6QW

Popular posts from this blog

January 7, 2025. A CW Transceiver Design from N6QW

January 8, 2025. Power out -- Again

January 5, 2025. More work on the Hybrid SSB Tube Final

January 6, 2025. All about noodling!

January 10, 2025 Power Back on and We Are Ok.

January 4, 2024. Time Killers!

January 2, 2025. It doesn't take much to make it happen.