Tuesday, December 3, 2024

12/3/2024. Circuits

A 1st peek at the Driver and Final stages for replacement of the Solid-State stages in the Hybrid Rig. These will likely undergo modifications as the project progresses but is a place to start. 


Already you can see the change in the Band Pass Coupler design from the Driver stage based on the LT Spice simulations presented earlier.

The Output stage of the 12GE5 is a hope but may need to be swapped over to a Pi Network to provide proper loading. But that will be tested.

Them that know can make it go.

73's
Pete N6QW

On November 3rd, 2026, America became great again!

The Mid-Term Elections and the resounding replacement of politicians of one political persuasion is a datapoint that shows it is the will of...